Industrial Execution · EPC Partner

Precision Execution for Next-Gen Sustainable Industry.

Specialized technical contracting, cleanroom integration, and utility-scale deployment for high-CapEx clean technologies.

Site Schematic / REV 04.2Active
CVD CLEANROOMINVERTER / MV YARDBESS ARRAYSCADAHVAC PLANT
Tolerance
±0.4 mm
Particulate
ISO 5
Uptime
99.4%
0%
ESG Audit Traceability
Chain-of-custody verified
ISO 0
Cleanroom Spec Ready
ISO 14644 Class 5–8
0
Zero-Loss Safety Record
0 LTI across 14 sites
0.0 GW+
Multi-GW & High-Spec Capacity
Deployed & commissioned
02Prisma

Sector Verticals

Deep domain teams, not generalist crews. Each vertical carries its own qualification stack, tooling inventory, and regulatory playbook.

V-01
Utility-scale wind turbines on an open plain under an overcast sky

Renewable Energy Infrastructure

Utility-scale solar, onshore wind, and grid-tied battery storage — from foundation works to interconnection witness testing.

Utility SolarWind O&MBESS Integration
V-02
Lab-grown diamonds on a matte slate surface under cool laboratory light

Advanced Materials & Synthetics

CVD reactor halls, lab-grown diamond growth suites, and bio-material pilot lines built to semiconductor-grade cleanliness.

CVD CleanroomsLGD GrowthBio-materials
V-03
Aerial view of utility-scale solar panel arrays

Future Cleantech & Hydrogen

High-pressure electrolyser skids, cryogenic handling, and specialized technical labor for first-of-a-kind facilities.

ElectrolysersHigh-PressureFOAK Labor
01Prisma

Service & Capabilities Matrix

Four execution disciplines, one accountable delivery structure. Every line item is scoped, specified, and traceable to a named engineering owner.

Civil preparation, cleanroom construction, and high-power thermal infrastructure delivered to fixed-date commissioning windows.

Civil & EarthworksPad grading, piling, access roads, drainage±10 mm level toleranceTurnkey
Cleanroom ConstructionModular wall systems, FFU ceilings, airlocksISO 14644 Class 5–8Certified
High-Power HVACChiller plants, process cooling, humidity control±0.5 °C stabilityTurnkey
Electrical BackboneMV switchgear, cable trays, earthing networksUp to 33 kVCertified
03Enterprise Risk Mitigation

Four pillars that protect the capital plan.

High-CapEx programs fail on interfaces, documentation, and schedule slip. Prisma is structured to remove all three before mobilization.

Precision Engineering

Tolerance-governed execution with metrology sign-off at every hold point. Nothing is closed out on assumption.

±0.4 mm
Install tolerance

Regulatory & ESG Compliance

Documentation packages built for auditors first: permits, provenance, emissions accounting, and safety governance.

100%
Audit traceability

Scalable Deployment

Repeatable crew structures and modular work packages that scale from a single suite to multi-gigawatt programs.

2.4 GW+
Delivered capacity

De-Risking Capital Projects

Schedule, interface, and commissioning risk retired early through constructability review and staged acceptance.

0 LTI
Across 14 sites
04Prisma

Selected Programs

Representative execution records. Full technical references are released under NDA with the capability statement.

CS-118Utility Solar

480 MWdc single-axis tracker plant

Full civil scope, MV yard, and SCADA commissioning delivered 6 weeks ahead of PPA milestone.

Capacity
480 MWdc
Schedule
-6 wks
Safety
0 LTI
CS-092CVD Cleanroom

Class 6 lab-grown diamond growth suite

24-reactor hall with gas panel distribution, chilled-water loop, and validated particulate performance.

Class
ISO 6
Reactors
24
Handover
On date
CS-140Battery Storage

220 MWh grid-forming BESS installation

Container placement, HV interconnection, and IEEE 1547 witness testing under a utility fast-track program.

Energy
220 MWh
Standard
IEEE 1547
Uptime
99.4%
05Prisma

Project Scope & ROI Estimator

Select a project type and stage. We generate a tailored technical inquiry and route it to the responsible engineering desk.

Step 01 — Project type
Step 02 — Project stage